直接写出的数. 906+94= 0.7×10= 0.8+9.2= 700﹣388= 1672÷8= = = = = =
修一条公路,计划每天修60米,实际每天多修15米,结果提前4天修完。一共修了多少米?
55×(++++)
++++++++
2.009×43+20.09×2.9+200.9×0.28
(2.5×)÷(×1.8)-0.75÷