“9×18”有多种分拆方法,请你接着往下算。9×18=9×10+9×8==9×18=9×9+9×9==
修一条公路,计划每天修60米,实际每天多修15米,结果提前4天修完。一共修了多少米?
55×(++++)
++++++++
2.009×43+20.09×2.9+200.9×0.28
(2.5×)÷(×1.8)-0.75÷