直接写出得数。9.12+4.5+0.88= 8.43+2.97+0.03= 10-2.75-0.25=4.9+4.9-0.9-0.9= 5.6+2.7-3.6= 15.25-3.1+0.75-4.9=
修一条公路,计划每天修60米,实际每天多修15米,结果提前4天修完。一共修了多少米?
55×(++++)
++++++++
2.009×43+20.09×2.9+200.9×0.28
(2.5×)÷(×1.8)-0.75÷