直接写出得数 0.3+0.47= 10﹣4.7= 0.33+0.3= 20.2﹣10.2= 7.6+0.4=3.9﹣0.6= 50.23+0.77= 48.51﹣4.09= 2.02+3.8= 8.4﹣4.8=
修一条公路,计划每天修60米,实际每天多修15米,结果提前4天修完。一共修了多少米?
55×(++++)
++++++++
2.009×43+20.09×2.9+200.9×0.28
(2.5×)÷(×1.8)-0.75÷