112. In all, 57 such trains are expected to be in ____ commercial operation by _____ end of 2009.
A.the; the | B.a; a | C./; the | D.a; the |
相关知识点
推荐套卷
112. In all, 57 such trains are expected to be in ____ commercial operation by _____ end of 2009.
A.the; the | B.a; a | C./; the | D.a; the |